DFB CUP FINAL

PROJECT OVERVIEW

  • Implementation of all branding & signage for the DFB and its sponsors
  • Creation of a unique cup atmosphere throughout Berlin
  • Marathon stairs construction
  • Adaptation of the DFB design to all relevant branding measures
  • Simultaneous assembly processing of various side events throughout Berlin
  • Football Village with subsequent After Show for the right VIP feeling

BERLIN, BERLIN - WE'RE DRIVING TO BERLIN!

For more than 10 years, APA has been the general outfitter of the DFB and the associated 150 events a year. As a specialist for branding, signage and way-finding, APA annually designs Germany’s biggest soccer festival – the DFB Cup in the historic Olympiastadion Berlin. Due to the relegation matches of Hertha BSC Berlin, APA had only 48 hours in 2022 to set the stage for the entire DFB Cup final – a Herculean task that we mastered with flying colors.

Integrated into the overall concept, numerous side events were also mounted in other locations to immerse Berlin completely in the colors of the DFB Cup. In addition to the scene-appropriate design of the Football Village for an inviting VIP feeling, another highlight is the all-round marathon staircase, which was professionally mounted to the listed Olympic Stadium using a special fastening technique.

SPECIALS

Consideration of the protection of historical monuments for all assemblies

Adaptation of the DFB’s corporate identity to all branding measures

Extremely short time window for a very complex setup

20-person assembly crew

WORKING HOURS
1265
DRAFTS
57
IDEAS
1000
SUCCESSES
36

AFTER THE MATCH IS BEFORE THE MATCH

APA has been the DFB's general outfitter since 2012 and brings its expertise to all events from the cup final and international matches to the integration award and Christmas parties. Already five months before the final kick-off, the planning of the APA project team for the DFB Cup Final starts. On site, the project is usually realized with more than 100 man-days in just under a week. What the APA Brands Events Solutions team normally has seven days for, had to be mastered in 2022 by our 52-man crew in 48 hours, despite extreme weather conditions, due to the relegation matches of Hertha BSC Berlin. What sounded like an almost unbelievable challenge was for the APA team only the proof of their know-how, which our team has built up through years of excellent work.

APA INNOVATION

  • Special technical constructions for the installation at the listed Olympia Stadium
  • Planning for simultaneous assembly processing in different locations in Berlin
  • Giant banner & covering marathon stairs with temporary fixing installation.
  • Storm proof installations
  • Set up & dismantle in record time